Saturday, April 20, 2019

Project eliverables, WBS and Gantt hart Assignment

Project eliverables, west by south and Gantt hart - Assignment ExampleObjectives of new food market viaduct replacement projectThe main objectives of the new market viaduct replacement project are1. Construction of fourth southbound lane from Gillies Avenue to the Green Lane.2. To arouse the current viaducts edge protection, traffic load capacity and seismic performance.3. The ability to maintain deed on the local roading network during construction.4. To achieve a residual design life for 100 years.5. probability to provide the collection, treatment and disposal of storm water to Auckland regional council TP10.6. To provide maximum retention of freeway debris and recognizing the land beneath the viaduct. This project involves the replacement of 700 m long new market Viaduct with a pre-cast segmental balanced cantilever structure constructed in two stages using an 800 t gantry. It includes the deconstruction of the existing bridge in two stages by implementing lengthy temporar y works to maintain stability of the construction. It excessively includes 50 m long Gillies Avenue over bridge with a Super-T bridge, realignment of the State Highway 1 off-ramp at Gillies Avenue and on-ramp at St. Marks Road to connect the realigned State Highway 1, installation of extensive concrete mass block walls for on-ramps, and construction of the new Dilworth footbridge. They provide the gate way to Auckland.Scope DetailsThe NZ place Agency utilized the construction and deconstruction staged approach for the implementation of motorway project.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.